We reviewed SOR objectives, identified analysis tools that would provide the information required for wise decision making, and recommended a tool for the analysis.
We subsequently helped staff from the Corps' Hydrologic Engineering Center (HEC) configure this tool, HEC-PRM, for analysis of Columbia system operation.
We assisted Corps staff with application of HEC-PRM and with interpretation of its results. In this application, we evaluated the following operations scenarios: (1) optimize operation for existing policy, with the existing treaty with Canada; (2) optimize operation, omitting hydropower objectives; and (3) optimize operation with additional storage at Mica Reservoir.
|